MATERIALS:
Carbon Steel
Aluminum
Stainless Steel
Galvanized/Galvanneal
Sheet
Plate
Bar
Tube
About Us
SMC Metal Fabricators, Inc. is a custom contract fabricator of sheet metal and light plate component parts, and assembled products. With over 50 years of experience in the market, SMC can provide solutions to your manufacturing needs. Our competitively priced products, processes and services are shipped on-time to meet your delivery requirements while our documented quality system assures conformance performance.
History
SMC Metal Fabricators, Inc. started in business in 1943 as a coal and fuel oil distributor. Doing some maintenance welding, the company became well known for the ability to repair and do production welding on a variety of different parts. Soon after, the company started to add fabrication machines to enhance its ability to provide more services to its customers. It was not many years later that the coal and fuel oil businesses were abandoned for complete fabrication services. In the late 1980's the technological additions included Laser Cutting, CNC Punch / Form, Robotic Welding, a Powder Coating Line, and Assembly. Now SMC Metal Fabricators, Inc. is able to provide complete contract manufacturing to its customers.
SMC Metal Fabricators, Inc. has positioned itself as a "Supplier of Choice" in the market segment that requires specialized sheet metal and light plate fabricated products in the gauge material sizes up to and including 5/8 inch.
Milestones
- 1943 - Stelzner Manufacturing Company (SMC)
- Coal and fuel services
- Maintenance weld shop
- Later job shop fab
- 1988 - SMC Division of Custom Industries
- Full service fab shop
- Powder coat value add
- Light Assemble started
- 1993 - SMC Metal Fabricators, Inc. - New Ownership
- Capital equipment commitment
- Full service fab reputation
- 1997 - First laser cut machine brought in
- 1998/1999 - Consolidate 3 sites into a new 115,000 sq ft building designed for SMC Fabrication flow
- 1999/2000 - Second laser and two new CNC press brakes
- 2001 - New management team: Excellent equipment and processes in place.focus on customer needed
- 2006 - Third laser added and new 175 ton press brake
- 2007 - New powder coat paint dry-off/cure oven
- 2008 - Second turret punch added and support equipment
